MT412 Advance Software Engineering: Meeting 15, Implementation of a software engineering project

UR Berdampak Diktisaintek Berdampak raharja.ac.id ↗

Slide · Mata kuliah MT412 · 2026

View the original document All documents

Overview

Executive summary

These slides lay out a team project run over ten meetings, from requirements to deployment. They contain a project overview, the organization of teams of 4-5 people, the main deliverables, a roadmap per meeting (P1 to P10), mandatory engineering practices (Git, testing, CI/CD), and a proposed assessment weighting. Note that the P1-P10 numbering in these slides refers to project stages, not meeting numbers in the RPS.

This summary is based on the text of the original document. For official citation, refer to the original file below.

Key points

What to know

  • Teams of 4-5 people with rotating roles: product owner, scrum master, developer, QA.
  • Deliverables: requirements and design documents, a repository with a tidy commit history, a CI/CD pipeline and tests, a deployed application, a demo, a report.
  • A 10-stage roadmap: kick-off, requirements analysis, design, DevOps setup, two sprints, testing, refactoring, deployment, demo and retrospective.
  • Mandatory practices: Git with pull requests, branching, code review, unit and integration tests, linter, CI on every push, CD to staging, containers.
  • Proposed weighting: process and documentation 20, implementation 30, testing and quality 20, demo and report 20, individual contribution 10 percent.
  • The weights are a proposal and can be adjusted to the RPS.

Document content

Content by chapter

Full text in Indonesian.

Full text in Indonesian

Tujuan dokumen

Memberi kerangka proyek akhir. Setelah pertemuan 1-10 pada kerangka ini, mahasiswa diharapkan menerapkan proses Agile dan DevOps pada proyek tim, merancang arsitektur dan mengimplementasikan perangkat lunak dari kebutuhan terdokumentasi, menerapkan version control, code review, pengujian otomatis, dan CI/CD, serta mendemonstrasikan hasil dan mengevaluasinya lewat retrospektif dan laporan.

Isi per topik

Gambaran proyek. Mahasiswa membangun perangkat lunak nyata secara bertahap dalam tim 4-5 orang dengan peran bergilir, backlog dan papan tugas bersama, serta sprint singkat dengan review dan retrospektif. Target: produk berjalan dari MVP hingga rilis.

TahapTopikAktivitasLuaran
P1Kick-off dan perencanaanPembentukan tim, pemilihan proyek, ruang lingkup awalProposal singkat, rencana proyek
P2Analisis kebutuhanUser story, product backlog, prioritas fiturBacklog dan SRS ringkas
P3Desain arsitektur dan UI/UXDiagram arsitektur dan UML, wireframe, pemilihan teknologiDokumen desain, wireframe
P4Setup lingkungan dan DevOpsRepositori Git, branching, papan tugas, CI dasarRepositori dan pipeline awal
P5Sprint 1: fitur intiImplementasi fitur MVP, code reviewMVP berjalan
P6Sprint 2: fitur lanjutanFitur tambahan, integrasi modul dan APIRilis inkremen kedua
P7Pengujian dan QAUnit test, integration test, cakupan pengujianLaporan pengujian
P8Refactoring dan kualitas kodeAnalisis statis, tinjauan keamanan dasar, perapian kodeKode bersih, daftar perbaikan
P9Deployment dan dokumentasiContainerization, staging, CD, dokumentasi pengguna dan teknisAplikasi ter-deploy, dokumentasi
P10Demo akhir dan retrospektifPresentasi, demo, refleksi proses, laporanDemo, laporan akhir

Praktik rekayasa: manajemen kode (Git, pull request, feature branch, pesan commit jelas, code review), kualitas dan pengujian (unit dan integration test, target cakupan, linter, Definition of Done), otomasi dan rilis (CI tiap push, CD ke staging, container, pemantauan dan rollback sederhana).

KomponenBobot usulanKriteria
Proses dan dokumentasi20%Backlog, desain, kelengkapan dokumen
Implementasi30%Fungsionalitas, arsitektur, kualitas kode
Pengujian dan kualitas20%Cakupan pengujian, CI/CD, hasil review
Demo dan laporan akhir20%Presentasi, produk ter-deploy, refleksi
Kontribusi individu10%Riwayat commit, peer assessment

Pertanyaan diskusi

  • Proyek apa yang layak dikerjakan dalam 10 pertemuan, dan apa cakupan MVP-nya?
  • Bagaimana membagi peran agar kontribusi merata?
  • Apa risiko terbesar proyek dan bagaimana mitigasinya?

Dipakai di mana

Slide ini dipakai pada mata kuliah MT412 Advance Software Engineering (semester 1), pertemuan ke-15. Kemampuan akhir pertemuan ini menurut RPS: Mahasiswa mampu mempresentasikan hasil pengembangan perangkat lunak secara profesional dan sistematis.

Dalam Dokumen Kurikulum OBE, mata kuliah MT412 mendukung CPL01, CPL03 dengan CPMK CPMK011, CPMK032. Rumusan dan peta lengkapnya ada di halaman Peta CPL dan CPMK.

Source

Original document

A preview of this file cannot be shown on the site yet because its access is still restricted. The summary and contents above were prepared from the original file.

Open the original document ↗

Document Preview

Smart Search MTI Universitas Raharja

Recommended: