MT412 Advance Software Engineering: Challenge Chapter 10, DevOps and release pipeline case study in retail

UR Berdampak Diktisaintek Berdampak raharja.ac.id ↗

Tantangan · Mata kuliah MT412 · 2026

View the original document All documents

Overview

Executive summary

Students complete this challenge on LearnHive, the Universitas Raharja LMS. Open LearnHive ↗

Chapter 10 casts students as head of the platform team at a minimarket chain with 900 stores. A payday promotion failed because discount settings differed on three of seven manually changed servers, and rollback took 14 hours. Management proposed two releases a month and extra admins. Students design a minimum CI/CD pipeline before the Ramadan promotion, an infrastructure as code roadmap, and reconcile speed with audit approval rules. The case is fictional.

This summary is based on the text of the original document. For official citation, refer to the original file below.

Key points

What to know

  • Adding release dates and server admins does not fix the root cause: manual configuration and a fragile release process.
  • Discount settings differed on 3 of 7 servers for nine hours, so store prices differed from the app.
  • Rollback took 14 hours because the old version was not stored properly.
  • Lead time from code change to production averages 26 days and one in three releases needs an emergency fix.
  • Feature branches live 3 to 6 weeks before merging, and automated tests exist for only 2 of 9 services.
  • Deploy scripts sit on an admin laptop and seven servers are configured manually without documentation.
  • Alternatives: continuous delivery with approval, feature flags for promotions, and repository-native CI tools.
  • Audit policy requires every price change to be approved by two officials.

Document content

Content by chapter

Full text in Indonesian.

Full text in Indonesian

Tujuan dokumen

Melatih mahasiswa mendiagnosis akar masalah rilis, merancang pipeline pengiriman minimum yang aman, dan menyelaraskan kecepatan bisnis dengan kendali audit.

Ringkasan tantangan

Peran: kepala tim platform dan DevOps di PT IndoSegar Mart (fiktif), jaringan minimarket dengan 900 toko dan aplikasi loyalitas berisi 4 juta anggota.

Situasi: Direktur Komersial ingin promo diluncurkan atau dihentikan dalam hitungan jam. Promo Ramadan terbesar dimulai sepuluh minggu lagi.

Kendala: tiga orang platform (satu paham kontainer), 20 pengembang, dan anggaran alat serta cloud terbatas; vendor menawarkan lisensi CI enterprise.

Fakta tersembunyi: promo harus bisa diluncurkan kapan saja, tetapi kebijakan audit mewajibkan persetujuan dua pejabat untuk perubahan harga.

Yang dikerjakan mahasiswa

  1. Menjelaskan kepada Direktur Komersial mengapa tambahan jadwal rilis dan admin server tidak menyelesaikan masalah kecepatan dan keandalan promo.
  2. Menguraikan pipeline CI/CD minimum sebelum Ramadan (tahapan, quality gate, strategi rilis, cara rollback), boleh dengan contoh alur kerja singkat, lalu peta jalan 6-12 bulan untuk infrastruktur sebagai kode, observability, dan metrik pengiriman.
  3. Menilai perlunya rilis otomatis penuh dan lisensi CI enterprise dibanding continuous delivery dengan persetujuan, feature flag, atau alat bawaan repositori.
  4. Menyelaraskan tuntutan kecepatan promo dengan aturan dua pejabat tanpa terkesan menolak salah satunya.

Keluaran yang diminta

  • Tulis satu esai 300 sampai 1.000 kata dari sudut pandang peran yang diberikan, boleh memakai sub-judul atau poin.
  • Jawaban menunjukkan masalah utama yang diidentifikasi, keputusan beserta alasannya, risiko dan batasan yang ditimbang, serta cara mengukur keberhasilan.
  • Analisis dianjurkan dikaitkan dengan pengalaman kerja, magang, atau proyek nyata bila relevan; nama dan angka kasus adalah fiktif.

Dikerjakan di LearnHive

Tantangan ini dikerjakan mahasiswa di LearnHive, platform belajar yang dipakai MTI. Halaman ini hanya merangkum isi dan tujuan tantangan; lembar tantangan lengkap ada pada dokumen asli di bawah.

Dipakai di mana

Tantangan Chapter 10 dipakai pada mata kuliah MT412 Advance Software Engineering (semester 1) sebagai latihan praktik untuk materi pertemuan 11, yaitu DevOps, pipeline CI/CD, dan infrastruktur sebagai kode. Chapter 1–7 bersesuaian dengan pertemuan 1–7, dan Chapter 8–14 dengan pertemuan 9–15 (pertemuan 8 adalah UTS).

Source

Original document